TwistedSTEEL666 wrote:Has the immelmann started going up yet?
Doubt it. I. Imagine they will finish up the stairs and walkways to the drop first. It wouldn't make sense to bring the big crane over there just to double back for the walkways.
TwistedSTEEL666 wrote:Has the immelmann started going up yet?
Yes it has!!
Sent from my iPhone using Tapatalk
B&M Guy - THANKS for making these videos!! You definitely should be among the first ride Rak!
Which part(s) of Rak will be in Demon's old queue and where is that exactly located? I know there's that large area that's on your left as you walk up the stairs and towards the switchbacks prior to the station
Single Day Ride Count Record
50 rides 8/17/2018 (Without Flash Pass - Coasters After Dark)
I'll eat my words, I really thought they'd finish the stairs and walkways first. I guess they're trying to finish up more track pieces before the weather hits.
As for Demon's queue, we only lost the "overflow" which was only ever used in Fright Fest and maybe fourth of July. I don't see that overflow returning based on the footer layout, but I think the exit will follow a similar path.
"I've been told that some part of every wish will be heard but lately I lost sight of the truth in those words."
Normally they do, but with how spread out the supports are, some track pieces actually compress and support other pieces adjacent to them.
This is why the drop and lift met in the middle.
I can't say for the the immelmann and dive loop follow the same logic, but maybe.
You can see this happened on X-Flight only once. The first drop built it's way up to meet the top and those were the only two or three pieces that were out of contiguous order.
I really hope they repaint Totally Kickin Chicken because it’s going to look so ugly crammed in right between Demon’s entrance and Wrath going right over it. I wonder where the Demon sign will go if its place has been taken by footers.
SFGAM_Hog wrote:I really hope they repaint Totally Kickin Chicken because it’s going to look so ugly crammed in right between Demon’s entrance and Wrath going right over it.
John mentioned a potential "retheme"
Sucker for a launch, custom audio and Demon | Coaster Count: 626
Goku1910 wrote:Normally they do, but with how spread out the supports are, some track pieces actually compress and support other pieces adjacent to them.
This is why the drop and lift met in the middle.
I can't say for the the immelmann and dive loop follow the same logic, but maybe.
You can see this happened on X-Flight only once. The first drop built it's way up to meet the top and those were the only two or three pieces that were out of contiguous order.
As for "Addition of Retail Space for Exiting of Rakshasa Ride", I don't see how Demon Snacks will serve any food going forward and it will be strictly retail (besides some candy and ice cream bars in a freezer), but we shall see
Sucker for a launch, custom audio and Demon | Coaster Count: 626
Something to note This says “addition” and not “renovation” Does that mean this is for a new structure specifically for Wrath or is it just a misprint that we know Gurnee has done in the past