Thanks Rob! Great work!! It's really a short distance from station to the railroad bridge. Also, it doesn't look like there is much room to get the train under the track (the barrel roll) and between the supports.
Single Day Ride Count Record
50 rides 8/17/2018 (Without Flash Pass - Coasters After Dark)
CoasterRiderSC wrote:Also, it doesn't look like there is much room to get the train under the track (the barrel roll) and between the supports.
Everything is bigger than it looks. You don't see it until a worker stands close to something. Then you get an idea of proportion.
There are three supports that come down within the width of the train bridge. The train track will be run through at an angle between the two supports furthest from the station.
They are planning to pour more concrete for the queue. You can also see from Sky Trek Tower where the exit path is going to go. Hope they can get it done quickly!
^ No, sorry. There wasn't anything really new except for the queue prep that I talked about. They painted the top of the entrance sign red. Looks nice!
looks like a majority of the footers haven't been grouted yet, or even formed out for grout, there is no possible way it opens within the next 2 weeks.
Also they haven't even installed all the bolts to hold the ride together, in the last pic above you can see where the track attaches to the supports, there are 2 bolts visible on a flange that can hold like 20
Favorite Wood Coasters: The Voyage, Ravine Flyer II, Thunderhead, Balder Favorite Steel: Voltron Nevera, Steel Vengeance, Expedition GeForce, Olympia Looping Parks visited: 232, Coasters Ridden: Steel: 894, Wood: 179, Total: 1073
I'm sticking with my June 22 prediction, although others have pointed out that there would be a soft opening several days before any official opening for the media and memberships.
FParker185 wrote:looks like a majority of the footers haven't been grouted yet, or even formed out for grout, there is no possible way it opens within the next 2 weeks.
Also they haven't even installed all the bolts to hold the ride together, in the last pic above you can see where the track attaches to the supports, there are 2 bolts visible on a flange that can hold like 20
Great observation!!!!
Single Day Ride Count Record
50 rides 8/17/2018 (Without Flash Pass - Coasters After Dark)
CoasterRiderSC wrote:Also, it doesn't look like there is much room to get the train under the track (the barrel roll) and between the supports.
Everything is bigger than it looks. You don't see it until a worker stands close to something. Then you get an idea of proportion.
There are three supports that come down within the width of the train bridge. The train track will be run through at an angle between the two supports furthest from the station.
Thanks for explaining that! It also looks very close to Raging Bull turnaround in some photos, and in others it looks like there's a big gap between the two rides.
Does anyone know if there will be any lights or effects in the underside of train bridge (kind of like what Demon has) ?
Single Day Ride Count Record
50 rides 8/17/2018 (Without Flash Pass - Coasters After Dark)
I hope they don't add any lights or sound effects. Going to be a quick trip through the tunnel, but would be cool for the tunnel to be dark especially at night. Sound effects could end up being more annoying than anything.
I'm looking at the pictures posted previously and it will be more of a tunnel than an actual bridge for the train, right? Like how it looked in the computer animation.