Ok, after COUNTLESS attempts, there are 2 things i cannot for the life of me figure out
1. getting the spiral starecase to ATTACH to the platform (it always stays the red color which means CAN NOT PLACE HERE), What am i doing wrong?
2. The PATHS for RCT3, how do i get them to connect to the POOLS? it seems the paths that come with the pools are slightly higher off ground then the walks, im just soooo confused lol
The answer to #2 is that the people have to go through a changing room to get into the pool complex. Use the changing room to attach park path with pool deck. Can you be a little more specific about question #1.
Universal Orlando Mechanical Engineer Marathon down, Goofy to go.
#1. you need to use the tan pool walkway first at the platform. 1 piece atleast. then try attaching the stairs.
http://themeparkcritic.com/scripts/profile/ViewProfile.asp?ViewID=2909 A furious storm once roared `cross the sea, catching ships in its path, helpless to flee. Instead of a certain and watery doom, the winds swept them here to Typhoon Lagoon!