As for my day, it started with many D Vu' rides. I counted maybe four rides from 10:15-12:30. It might have been five though. The line was mostly just in the station except later it got to when you have to go through two ques.
The stupid announcements really slow down the ride. It's slow enough, but then you have the employees telling you "Are you ready?" and "Are you ready for the floor to to go down low?" (I wasn't something really stupid like that.) The people early on working the ride were slow as molasses. They put like a "dragster" stripes on the catchcar. They did something to it, because the ride only broke down once, which didn't even seem like a break down. It was perfect today except for that.
After that, it was off to Demon and Triple Play which were both walk-ons. Then, I had to go to the train station for my family to pick up my day. Sadly, it wasn't till three-thiry until we got into the park. Next, it was STT which was a walk-on. After that, it was off to SUF for two awesome rides. The line wasn't that long.
Next, it was BEB, and then RC (bah humbug). I really don't like RC, but my brother does. After that, I was off to 4 times on BTR, and 3 times on V2. They were both walk-on. After that, it was IW once, and Am E red.
Finally, it was off to D Vu' again for at least another hour. The line had toned somewhat. Now, the line didn't get up to the ques, but rather was just in the station. The people were doing a much better job than in the morning. During this time, I probably did it 5 times. Lastly, I ended my day with three SUF's.
I also want to add that it really doesn't LOOK like HH will be open. I looks like a mess. My family thinks that next to Viper they are building something. They don't know what. They said maybe ride, but I don't believe them. I'll check it out tomorrow though.
What a great day it was !!!!!

